The Future of Electric Power Generation is
Distributed, Intelligent & On-Demand
Distributed Power
  • Generate power at the point-of-use
  • Eliminates transmission loss
  • Eliminates surge power generation loss
  • Compact, safe, quiet, configurable
  • Serves remote and off grid customers
Smart Digital Power
  • Generate clean utility power
  • AC and/or DC power – all configurations
  • Optimizes performance with AI-based controls
  • Active and secure cloud-based monitoring
  • UPS quality with auto Power Factor correction
On-Demand Power
  • Generate power when/as it is needed
  • Fast response to transient loads
  • Accommodates inrush power
  • Stores excess power economically
  • Highly reliable – configurable kWs to GWs
...and the future is 'true' green power
Eradicate Pollution In THE Quest for Energy.
The retreat from fossil fuels is underway. In 2019, U.S. coal-fired power plants shut down at the second-fastest pace on record, retiring or converting roughly 15,100 megawatts (MW) of coal-fired electricity generation. The challenge is finding viable alternatives. Most “green-energy” solutions are impractical, expensive, not sustainable or recyclable.
We solve this problem with a zero emission power platform that provides distributed power, on-demand, in any configuration. The safe, compact footprint is scalable and dispatchable (grid tie or island mode). Our patented and proprietary Magnetic Resonance Generator’s 98% efficiency is unmatched – producing no heat, emissions, mechanical or transmission waste.
Today's electricity generation problem.

Electricity, our most wanted form of energy, is versatile but costly to generate, store and deliver.  Traditional fuel-based power generation is expensive, environmentally harmful and highly inefficient.

...Is not a problem any more.

Meta solves these issues with a distributed power solution harnessing electricity with an ultra-efficient magnetic ‘fuel’ generator producing clean power on-demand, eliminating most of the inherent waste of conventional systems.