The Blueflux advanced Power-Mesh is a smart power grid which mirrors the structure of a honeycomb mesh network, emphasizing redundancy, interconnectedness, and decentralized control.
POWER INFRASTRUCTURE
StandalonE NODES AND POWER MESH
The Blueflux Power-Mesh is a network of interconnected Blueflux nodes, each serving as a local power generation and distribution node. These nodes, including solar farms, wind turbines, and traditional power stations, are linked by high-frequency DC lines or underground cables, enabling efficient energy transfer and load balancing. Each node features a control unit that monitors power generation, consumption, and storage, ensuring autonomous operation and resource sharing. In case of a node failure, adjacent nodes reroute power to maintain supply. This private grid integrates renewable energy and energy storage systems, enhancing reliability, scalability, and efficiency while promoting sustainability.





