Blueflux offers versatile, future-ready power solutions for modern data centers. Conventional AC power to efficient non-rectifier-based AC-to-DC conversion, to grid-independent DC Power Clusters, we got it covered.
POWERING HIGH-DENSITY RACKS
Our modular framework delivers high-density power directly to the rack with greater efficiency, reducing costs and emissions. The DC busbar topology enables rapid, low-cost future expansion. With faster deployment, our systems help developers meet today’s risk/return targets while remaining flexible enough to accommodate future market demands and power growth.
THE RISE OF 48V DC
Devices traditionally classified as low-voltage (powered by AC circuits) are being pushed into high-voltage categories to meet rising power demands.


Blueflux DC topologies enable high-density power deliverywhile staying within the low-voltage classification.


“Power generation is evolving from passive systems to AI-managed, demand-based platforms, driving greater efficiency and resilience. Blueflux is leading that transformation today.”
DC POWER CLUSTERS
POWERING AI-DATA CENTERS
Blueflux modular platforms reduce power losses to just 2-5%, compared to up to 50% in conventional AC systems. Their modular design allows for faster installations, fewer regulatory hurdles, and greater adaptability than traditional stick-build systems.





